Skip to content
How it works

What the platform does with what you tell it

Nothing here is a black box. This page sets out the exact fields collected, how a fit score is computed, and how the internal qualification works.

1 · The requirement

Five steps, plus a conditional sixth for aviation compliance.

Your organisation

01

Who is buying, who signs, and where you are in onboarding.

9 required of 25 fields · ~3 min

Why you need credits

02

The driver behind the purchase, and how far along your decarbonisation is.

3 required of 11 fields · ~2 min

What you want to buy

03

Volume, budget, timing and how you would like the deal structured.

5 required of 30 fields · ~4 min

Credit specification

04

Which programmes, project types and vintages you will accept.

3 required of 30 fields · ~5 min

CORSIA parameters

04Aconditional

Aviation compliance detail. Shown because you asked for CORSIA-eligible units.

1 required of 33 fields · ~5 min

Use, retirement & claims

05

How the credits will be retired and what you intend to say publicly.

10 required of 25 fields · ~4 min

The CORSIA step only appears if you ask for CORSIA-eligible units. Several individual fields behave the same way — durability only matters for removals, corresponding-adjustment status only matters once you have asked for authorisation.

2 · Matching

Two stages: hard requirements that block, then weighted preferences that rank.

Blockers

A lot is ineligible when it fails something you stated as a hard requirement.

  • Registry or unit type outside your accepted list
  • Vintage outside your window
  • Price above your stated ceiling
  • Not issued when you require issued credits
  • Volume below your minimum offer size
  • Missing a label you marked Required — CCP, CORSIA, Article 6, corresponding adjustment
  • Trips one of your Absolute exclusions

Ineligible lots are still shown, with the reason, so you can see which constraint is doing the filtering.

Fit score

A weighted average over the preferences you actually expressed, from 0 to 100. State no preferences and there is no score — a blank requirement cannot produce a meaningful ranking.

  • Price against your target (not your ceiling)
  • How much of your volume one lot covers
  • Reduction / avoidance / removal, and project category
  • Preferred activities, geographies and scale
  • Labels you marked Preferred rather than Required
  • Direct-from-project sourcing and payment terms
  • Conditional and Preference exclusions, which downrank rather than block

3 · Internal qualification

What our team does with your submission. Shown for transparency; buyers do not see their own score.

Knock-out gates

Any failure caps the outcome at Decline, whatever the score.

G1 Integrity & KYC
Buyer and jurisdiction pass sanctions and KYC screening.
G2 Mandate fit
No requirement that cannot be supported — excluded registry as sole option, unsupportable claim, required CORSIA programme not TAB-approved for the stated period, or LOA/CA unavailable where required.
G3 Minimum viable opportunity
At least one of: budget, decision authority, defined volume.
G4 Independence / conflict
No conflict of interest, e.g. verifying an in-house-prepared inventory.

Weighted criteria

Each scored 1–5 by an analyst, then weighted to a score out of 100.

Service fit & scope alignment0.18
Deal value (volume × budget)0.16
Budget realism vs market price0.14
Requirement clarity & buyer readiness0.12
Timeline feasibility0.10
Claim & integrity-risk exposure0.10
Buyer credibility & governance0.08
Strategic / cross-sell / relationship value0.07
Competitive position (win probability)0.05

≥75 Tier A · 55–74 Tier B · 40–54 Tier C · below 40 or any gate failure, Decline.

4 · Indicative price bands

Analyst estimates used for budget sanity checks.

Quality tierLow USD/tCO2eHigh USD/tCO2e
Avoidance – standard39
Avoidance – CCP-labelled820
Removal – nature-based1545
Removal – engineered CDR110350
CORSIA-eligible1842
Article 6 authorised2465
These are analyst-entered reference points, not market data, and they are used only to sanity-check a stated budget against the quality tier requested. They are not quotes and no offer should be inferred from them.

5 · What is verified, and what is not

Registry, eligibility, CCP, CORSIA and Article 6 attributes shown anywhere on this platform are declared by the buyer or the seller who entered them. They are independently re-verified before contracting, and until then must not be relied on as validated facts. Universal Carbon Registry and Climate Action Reserve credits are excluded by policy and cannot be listed or requested.